Project Information

Main Dwelling
General Lighting Load CEC 220.12 / 220.42 / 220.52
Factor Quantity VA
1. General Lighting (Sq. Ft. × 3 VA/Sq. Ft.) CEC 220.12 3 × — sq ft —
2. Small Appliance Circuits (1,500 VA/circuit, 2 min.) CEC 220.52(A) 1,500 × circuits —
3. Laundry Circuit (1,500 VA/circuit) CEC 220.52(B) 1,500 × circuits —
4. Total General Lighting Load (Lines 1+2+3) —
5. First 3,000 VA @ 100% 3,000
6. Remainder (Total − 3,000) @ 35% CEC 220.42 — × 35% —
7. Net General Lighting Load (Lines 5+6) CEC 220.42 —
Fixed Appliances CEC 220.53
Appliance New / Existing VA Each Qty VA Total
Garbage Disposal
—
Microwave
—
Dishwasher
—
Bathroom Fan
—
Range / Oven  
—
Kitchen Exhaust Hood
—
Other:
—
Total Fixed Appliance VA = —
8. ≤3 appliances (by quantity) → 100% · ≥4 appliances → 75% of Total VA CEC 220.53
—
Other Loads CEC 220.14 / 430.24
Load New / Existing Nameplate VA Each Qty VA Total
9. Air Conditioner
—
10. Clothes Washer
—
11. Electric Clothes Dryer
—
12. Electric Vehicle Charger (EVSE)
—
13. Heat Pump Water Heater
—
Other:
—
14. 25% of Largest Motor CEC 430.24
Auto-detected from entries above
—
—VA
—A
—A
CEC 225.39 & 230.79 — Service Rating must equal or exceed Total Service Load Amperes, and must be no less than 100 A.